The challenge
A global flexible workspace provider opening a new flagship location in central London needed the building’s entire technology backbone built from a blank floor plan, for a fixed launch date, with the client’s executive board and VIP guests attending the opening event. Spanning five floors, the space accommodated everything from single hot-desks to a full-scale conference hall, alongside the always-on connectivity, security and member experience expected of a premium workspace brand. As one site within a global portfolio, it needed to connect directly into the client’s existing global network.
What we did
- Delivered full IT planning, design, procurement, installation and configuration from a blank floor plate, including structured fibre and ethernet cabling across all five floors
- Deployed 42 managed wireless access points for full-building secure Wi-Fi, running the latest security toolset
- Built out state-of-the-art networking, meeting room and video conferencing technology across a full range of spaces, from small meeting rooms to a large conference hall
- Installed member and visitor access control alongside AI-integrated CCTV across the building
- Connected the new site into the client’s existing global network, linking it with sites across Europe, the Middle East and the USA
The result
The building opened on schedule, fully wired, connected and secure, in time for a launch event attended by the client’s executive board and VIP guests. Coubari’s work ethic, technical proficiency, execution and customer engagement were singled out for recognition by the client’s leadership at the opening, and the relationship has since grown into four further successful, five-figure projects across the client’s wider portfolio.
“Coubari’s named-engineers approach was both essential and suited our business ethos.”
Senior Manager, Serviced Offices Business

